Skip to content

FAQs

Why did Belmont Park need a rebuild?

The old grandstand was a mid century structure built for crowds far larger than the sport draws today, so NYRA replaced it with a smaller, roughly 300,000 square foot building funded by a $455 million state backed loan, freeing up space for public green areas around the track.